Sigma Cluster Bovendijle: optimalisatie overloopdijkhoogte
Coen, L.; Peeters, P.; Verwaest, T.; Mostaert, F. (2016). Sigma Cluster Bovendijle: optimalisatie overloopdijkhoogte. versie 4.0. WL Rapporten, 15_091_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 27 pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Numerical modelling
    Water management > Hydraulics > Hydrodynamic models
    Water management > Water policy > Policy support
    Belgium, Bovendijle
Author keywords
    GOG overloopdijk; Actualisatie Sigmaplan

Project Top | Authors 
  • Sigma cluster Bovendijle - optimalisatie, more

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Zeeschelde, more


Authors  Top 

Abstract
    Uit de resultaten van scenarioberekeningen met de Sinterklaasstorm is gebleken dat de inrichting van Sigma cluster Bovendijle voor verbetering vatbaar is. Op vraag van W&Z, Afdeling Zeeschelde worden drie scenarioberekeningen uitgevoerd om de overloopdijkhoogte van de GOG’s Rijmenam en Hoogdonk te optimaliseren.

    De grootste daling van de maximale waterpeilen wordt gerealiseerd door geen overloopdijken te voorzien. Indien GOG Hoogdonk niet onder T5 en GOG Rijmenam niet onder T10 GOG-werking mogen ondervinden, wordt voorgesteld de overloopdijkhoogten te verlagen met respectievelijk 50 cm voor GOG Rijmenam en 60 cm voor GOG Hoogdonk ten opzichte van het MWeA.