[ report an error in this record ]basket (0): add | show Print this page

Evaluation of the external effects on the siltation in Deurganckdok: report 2.11. Salt silt and current distribution entrance Deurganckdok: frame measurements and through tide measurements: winter 2012
International Marine and Dredging Consultants; Deltares; GEMS International (2012). Evaluation of the external effects on the siltation in Deurganckdok: report 2.11. Salt silt and current distribution entrance Deurganckdok: frame measurements and through tide measurements: winter 2012. version 2.0. Vlaamse Overheid. Afdeling Maritieme Toegang: Antwerpen. VI, 360 pp.

Available in  Authors 
Document type: Project report

Keywords
    Measurement
    Motion > Tidal motion > Tides
    Siltation
    Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions]
    Brackish water

Project Top | Authors 
  • Opvolging externe effecten DGD, more

Authors  Top 
  • International Marine and Dredging Consultants, more
  • Deltares, more
  • GEMS International, more
  • Roose, F., revisor, more
  • Vanlede, J., revisor, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors