Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan
De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp.

Available in  Authors 

Keywords
    Construction
    Floodplains
    Belgium, Zeeschelde, Kalkense meersen
Author keywords
    Geactualiseerd Sigmaplan

Authors  Top 
  • De Beukelaer-Dossche, M., editor, more
  • Decleyre, D., editor, more

Content
  • Decleyre, D.; De Beukelaer-Dossche, M. (2013). Introduction, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 7-8, more
  • De Beukelaer-Dossche, M.; Van den Bergh, E. (2013). Context, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 11-29, more
  • Van Rompaey, M.; Decleyre, D. (2013). Public support, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 31-43, more
  • Van Rompaey, M. (2013). Conceptual choices, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 45-59, more
  • Decleyre, D.; Maris, T.; Van Ryckegem, G. (2013). Nature, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 61-85, more
  • Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P. (2013). Preparatory investigation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 87-99, more
  • Van Looveren, R.; Moeskops, S.; Boone, C.; Peeters, P.; Decleyre, D. (2013). Technical design, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 101-109, more
  • De Beukelaer-Dossche, M.; Vanremoortele, S. (2013). Work, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 111-119, more
  • Maris, T.; Peeters, P. (2013). Monitoring, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 121-127, more
  • De Beukelaer-Dossche, M. (2013). General evaluation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 129-133, more